Skip to main content

Welcome to the Avanti Blog

Your go-to source for the latest in injection grouting. Stay informed about upcoming grout schools, discover new products and certifications, and explore featured articles in industry magazines. Join our community of grouting enthusiasts and stay ahead in the world of infrastructure solutions.

14 December 2012

Chemical Grouting Tips

Posted in Industry News

Never lose man hours over the simple stuff!

  1. Have extra Zerk® couplers onsite in case you gum one up.
  2. Line your grout buckets with thick mil garbage bags. This makes clean up easy, saves the pail, and prevents the grout from being contaminated.
  3. Get a socket wrench to install packers. It really speeds up their installation.

21 November 2012

Was it Teaching or Adding Depth to Different Perspectives?

Posted in Industry News

Was it Teaching or Adding Depth to Different Perspectives?

The two-day Urethane Injection School November 13-14 was a rich learning experience for everyone including Avanti team members. The talent pool in the audience ranged from owners of multi-disciplined construction companies to engineers from Mexico to presidents seeking to expand their services. So how do you advance the individual skill-sets within a group so widely diversified? Answer: See, Touch, Experience.

10 September 2012

Creativity—Sometimes the Most Important Ingredient

Posted in Industry News

PLACE: Tacoma, Washington
PROPERTY: Oil Recycling Station
PROBLEM: Retaining wall with 10 access holes and two 8" HDPE pipe penetrations less than 4' from railroad tracks. 

The engineering drawing called for "Flexible Material" surrounding these pipe penetrations, but provided no recommendation or specification. Avanti Field Services visited the site and noted the high probability of pipe deflection and movement as tanker cars went over them. This conundrum required a creative solution.

29 August 2012

PROGRESS AFTER 5:00

Posted in Industry News

This industry does not operate with an  8-to-5 mentality. Nor do we. Between the overnight hours of 5:00 pm and 7:30 am next day, progress continues on the jobsite, in planning and preparation, by customers and partners. When you need us, we want to be there.  Going forward, here’s what you can expect.

For questions that cannot wait until the next business day, Avanti personnel are available 24/7/365. Urgent calls are defined as jobsite questions and you can expect a 30 minute call-back until 7:30 next morning. Non urgent calls are acceptable between 5:00-9:00 pm (central) for engineers needing assistance on a spec, contractors working on proposals, municipalities and distributors with product/performance questions.

31 July 2012

EDUCATION - The Way Forward

Posted in Industry News

A unique partnership exists between 3 companies working as 1 to serve communities large and small. By educating Public Works departments why maintenance & repair operations are the first to prioritize versus the first to cut and save, communities are reducing costs, saving operating capital and minimizing wasteful spending. Tall order? Not when your underground sewer systems are in good working order.

Ground water infiltration into sanitary sewer systems cause municipal and county governments to manage up to 50% more flow into their treatment facilities than necessary. Since the cost to treat is higher than the cost to repair, common sense suggests Proactive Repair & Maintenance pays dividends.

<<  10 11 12 13 14 [15