Case Study: Preventing Leaks While Sinking Tunnel Shafts

  • Problem: Twelve manhole shafts for a mile-long tunnel, part of a trunk storm sewer being constructed 50 feet below a Dallas Freeway, had to pass through 20 to 25 feet of saturated sand before reaching bedrock.