Case Study: Controlling Seepage During Construction of Underground Missile Bases

  • Problem: With construction still in progress, numerous leaks appeared at the joints and bolt holes of corrugated steel-pipe tunnels connecting missile silos to control centers. Welding and sealing compounds failed to stop seepage.